|
| Configuring ULINKTo select ULINK as the µVision Debugger interface: - Open the Project — Options for Target dialog.
- Select the Debug tab.
- Click the Use button
- Select the Infineon XC800 ULINK Driver from the drop-down.
- Check the Load Application at Startup and the Go till main() options.

- Click on Settings to open the Target Driver Setup dialog.
To select ULINK as the Flash Programming Tool: - Select the Utilities tab.
- Click the Use Target Driver for Flash Programming button.
- Select the Infineon XC800 ULINK Driver from the drop-down.

- Click on Settings to open the Target Driver Setup dialog.
Note Enable the Update Target before Debugging to automatically download the program to the Flash ROM when the debugger starts.
|
|